Specifications include, but are not limited to: The work includes the construction of approximately: MOBILIZATION LUMP SUM 1 GRUBBING EACH 4 REMOVE CURB AND GUTTER LIN FT 270 REMOVE DRAINAGE STRUCTURE EACH 2 REMOVE SEWER PIPE (STORM) LIN FT 52 SAWING PAVEMENT LIN FT 380 REMOVE PAVEMENT SQ YD 220 REMOVE CONCRETE WALK SQ YD 255 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 250 COMMON EXCAVATION (P) CU YD 95 SELECT GRANULAR EMBANKMENT (CV) CU YD 46 GEOTEXTILE FABRIC TYPE 7 SQ YD 220 AGGREGATE BASE (CV) CLASS 5 CU YD 46 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TON 41 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C) TON 67 12" RC PIPE SEWER CLV DES 3006 LIN FT 63 18" RC PIPE SEWER CLV DES 3006 LIN FT 376 CONNECT TO EXISTING STORM SEWER EACH 4 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL LIN FT 9 CONSTRUCT DRAINAGE STRUCTURE DESIGN 4020-48 LIN FT 18 CASTING ASSEMBLY EACH 7 ADJUST FRAME AND RING CASTING EACH 1 4" CONCRETE WALK SQ FT 1320 6" CONCRETE WALK SQ FT 315 CONCRETE CURB & GUTTER DESIGN B618 LIN FT 275 7" CONCRETE DRIVEWAY PAVEMENT SQ YD 45 TRUNCATED DOMES SQ FT 40 TRAFFIC CONTROL LUMP SUM 1 STORM DRAIN INLET PROTECTION LUMP SUM 1 STABILIZED CONSTRUCTION EXIT LUMP SUM 1 TURF ESTABLISHMENT SQ YD 270 4" SOLID LINE PAINT LIN FT 290 together with numerous related items of work, all in accordance with Plans and Specifications.