Specifications include, but are not limited to: The selected contractor will be responsible for asbestos remediation, demolition, and disposal of all building materials comprising the existing structure and walk-in freezer. The following tasks will be expected of the contractor: • Coordination of project schedule, timelines, and any subcontractors. • Asbestos and hazardous materials abatement, compliant with applicable local, state (CDPHE), and federal requirements. • Maintaining best management practices (BMPs) for water quality during demolition (site is adjacent to Bear Creek and within the flood hazard zone). • Demolition and disposal of all debris associated with the existing structure, including any incidental interior contents, along with a small pile of broken concrete debris. • Removal and disposal of building foundation. Replacement with clean soil to ground level, graded for positive drainage. • Disconnection and removal of any utility service lines (gas, electric, telecom., etc.). • Abandonment of sanitary sewer line. Capping of Denver Water service line inside of property. • Maintaining a safe and clean demolition site at a high visibility location. • Obtaining necessary permits, approvals, and permissions associated with the above work.