All correspondence must be made through the Vendor Portal. Specifications include, but are not limited to: MILLING OPERATION - A. Mill so the finished surface is free from gouges, grooves, and ridges and is in accordance with the specified surface tolerance requirements, or as directed. B. To facilitate traffic control, pick up and move milled material, as specified, immediately after the milling operations. C. Use care to remove the existing asphalt material around all utility facilities within the work areas. D. Repair or replace, to the satisfaction of the utility owner, utility facilities which are damaged by the milling operation. E. Control the rate of milling to avoid tearing of the mat, resulting in chunky and non-uniformly milled material. F. Separate oversize and chunky milled material as directed. G. Keep the milled pavement surface free of all loose materials and dust.