Specifications include, but are not limited to: Scope of Supply for seven (7) vertical pressure filters: • Core filter, gravel profile, and general observations • Sieve analysis of filter and anthracite • Media expansion testing Clarifications: • Filter to be drained and dirty prior to arrival of crew • Quote is based on (3) filters per day Standard Provisions: 1. Qualified manpower: a. Onsite Supervisor/Environmental Technician/Hole Watch b. Certifications in Forklift/Reach Lift, Crane Operator, Confined Space and Rescue, and First Aid/CPR/AED 2. Equipment and PPE: a. High-power industrial vacuum system b. Ventilation fan for air circulation c. Four gas monitors for pre-entry and continuous LEL testing d. Air-purifying respirators (supplied air respirators available if required) 3. Plant Operator on site to perform operational functions as required. 4. If requested provide drawing(s) of filter(s) for inspection (including filter bed design) prior to arrival at the job site. 5. Allow access to as many offline vessels as possible and indicate that number when quoting to perform the inspection.