Specifications include, but are not limited to: All assessment work shall be in accordance with the versions of the International Building Code, the International Residential Code, International Existing Building Code, and the ASCE 24‐14 Flood Resistant Design and Construction in effect at the time of construction or the most recent substantial improvement, as that term is defined in 44 C.F.R. § 59.1. The work will be performed in a two‐phase effort: Phase I: All work performed will be done utilizing flood plain maps as provided by FEMA or local authorities having jurisdiction. All state properties will be assessed from available mapping to determine its flood hazard area status. Any state‐owned property located in or within close proximity to flood hazard areas or special flood hazard areas shall require a site visit and further investigation as described in Phase II. Flood hazard areas will be as defined per ASCE 24‐14 Flood Resistant Design and Construction, Chapter 1, Section 1.3 Identification of Flood Hazard Areas. Phase II: Site Visits will be required for all state‐owned properties that lie in or within close proximity to established flood hazard areas or special flood hazard areas. All structures and developments located on the property shall be assessed regarding the damaging effects the base flood would impose on the structures or developments. Conduct a facility condition assessment of the primary facility components for items such as mechanical, electrical, plumbing, structural components, utilities, envelope, and other key aspects related to potential flood damage. Provide detailed reports, both written and electronic, Flood plain RFQ, page 2 which include mitigation cost for bringing the facility into compliance with flood plain mitigation standards. Reports should include items such as: a. Three‐dimensional data (latitude, longitude, & elevation) collected for the sites and provided to the ADOI in an industry standard GIS format. b. All structures on site shall be classified per ASCE 24‐14 Table 1‐1 Flood Design Class of Buildings and Structures. c. Utilities located on site shall be assessed for flood resistance potential. d. Building materials and construction type should be assessed for flood proofing and or resistance potential. e. Foundation types shall be recorded and assessed per resistance to flooding / storm damage. f. Photographs of the structure or development to convey pertinent information. g. Mitigation cost estimation: Develop an itemized cost estimate for bringing the buildings, structures, or development into compliance. h. Provide other pertinent data as determined by site investigation. i. All data shall be compiled into a facility condition assessment (FCA) in compliance with ASTM E‐2018.