Specifications include, but are not limited to: The Work to be completed for the Lift Stations 2, 6, and 26 Upgrades is described briefly as follows: In general, construction shall consist of rehabilitation of two lift stations, construction of a new lift station, and extension of an existing force main. Work will entail removal and replacement of pumps, control panels, fence, gates, floats, etc. The project will also require construction of a new wet well, lift station site, valves, piping, setting doghouse manhole, installing sanitary sewer pipe, and installing force main of various size by means of open cut and jack and bore. Force main installation will require sawcut removal/replace of driveways and asphalt overlay for impacted areas. Bypass pumping will be required as needed to keep wet wells drawn down to maintain compliance during construction.