Provide labor and materials to: Remove the current flooring (VCT tile/ non-Asbestos) Dispose of all tile removed in accordance to all safety guidelines Make all required repairs to the floor before new flooring is installed. Installation of wood Gym Floor. The gym is approximately 3800 sq. ft. Sand and buff floors as needed. Refinish floors sing sealer and multiple coats of high gloss athletic finish. Paint lines for main basketball court, four (4) secondary basketball courts, Paint logo in the center of the floor Replace transition strips and thresholds. Replace and repaint quarter round and baseboards as needed. All work and product covered by warranty for one (1) year unless specified for a longer period by installation company. Items to Note The floor seal and finish shall be MFMA approved oil-modified products. Finish materials: MFMA (SPEC) approved oil modified polyurethane seal and finish or equal. Game line paint shall be recommended by the finish manufacturer and compatible with finish. The striping paint shall be recommended by the finish manufacturer. Any and all other materials needed shall be compatible with and approved by the manufacturer of the gym floor finish materials (VOC Compliant) Provide the owner with maintenance instructions, including material recommendations for this floor finish and subsequent recoating’s. Thresholds - Aluminum, mill finish, in widths enough to cover door transitions. Volleyball Sleeves - Senoh, as supplied by Sports Imports, 800/556-3198. Contractor to field verify dimensions and specifics of all before placing bid. Not responsible for contractor errors as a result of non-field verification.