Specifications include, but are not limited to: 1. Full width 2” depth cold milling, placement of 2” type “C” compacted asphaltic concrete overlay, of the outer loop roadway of the “North Boathouse” parking lot on the east side of the KATY Trail north of Boone’s Lick Rd. extended (Approximately 6,150 square yards). Includes 2” milling of transition joints at edges of asphalt parking lot. The Contractor shall furnish at its own expense, all labor, vehicles, equipment, tools, fuel, facilities, and any other item necessary to accomplish the work required under the contract. a. “North Boathouse” outer loop roadway of the parking lot on the east side of the KATY Trail north of Boone’s Lick Rd. extended (Approximately 6,150 square yards) 2. Placement of 1-1/2” type “C” compacted asphaltic concrete overlay, and re-striping of two (2) public parking lots listed below in downtown St. Charles. Includes 1-1/2” milling of transition joints at edges of asphalt parking lot and crack sealing prior to asphalt overlay. Also includes placement of a wedge/leveling course, if needed, to alleviate irregularities in the parking lot, promote better surface drainage, and improve cross traffic grades. The Contractor shall furnish at its own expense, all labor, vehicles, equipment, tools, fuel, facilities, and any other item necessary to accomplish the work required under the contract. a. “Farmer’s Market” parking lot on the east side of the 300 block of N. Riverside Dr. across from Monroe St. (Approximately 1,600 square yards) b. “First Capitol” parking lot on the west side of the 300-500 blocks of S. Riverside Dr. between First Capitol Dr. and Pike St. (Approximately 4,700 square yards)...