Specifications include, but are not limited to: A. Develop a design phase commissioning plan including a management strategy and list of features and systems to be commissioned (MEP systems and the building envelope). An initial draft of the plan shall be submitted for review and comment by The City. B. Contract document review. Includes reviews of both complete design development documents and complete construction documents (100%) prior to issuing the construction documents for bid. Perform review and verify incorporation of mid- design corrections. Comply with the requirements of HighPerformance Building Standards Enhanced Commissioning. C. Assist, review, and approve development and updating of the Owner Project Requirements (OPR) and the Design Record documentation by Design Team members specifically the Basis of Design (BOD) Narrative for inclusion into the commissioning plan. (At minimum per the Mandatory Requirements in section 16a-38k3(a). D. Develop full commissioning specifications and include all commissioned equipment. Coordinate and integrate into the specifications of the Architect and Engineer of Record. The commissioning specification will include but is not limited to the following: a detailed description of the responsibilities of all parties, details of the commissioning process; reporting and documentation requirements including formats; alerts to coordination issues, deficiency resolution; construction checklist and startup requirements; the systems to be commissioned; the functional testing process; specific functional test requirements, including testing conditions and acceptance criteria for each piece of equipment being commissioned. (At minimum per the Mandatory Requirements in section 16a-38k-3(a) E. Schedule and facilitate a controls integration and pre-balancing meeting with the Engineer of Record, Program Manager, Construction Manager, Facilities/Maintenance Staff and Subcontractors to discuss and resolve integration issues between equipment, systems, and disciplines to ensure integration issues and responsibilities are clearly defined. F. Participate in meetings pertaining to Connecticut High Performance activities during project design and issue commissioning progress reports as required by the High-Performance Building Guidelines. G. Lead and attend a design meeting with the design team, CM, and NPS Facilities Department to establish building set points, sequences of operation, and other operational parameters for inclusion into the specifications. Meeting minutes shall be provided to the team at the completion of the meeting to serve as a record of the decisions made. The CxA will be responsible for ensuring that all operational parameters are incorporated into the project specifications.