Specifications include, but are not limited to: Glen Lake Community School is requesting proposals to provide services to facilitate the removal and replacement of the existing septic system and drainfield that supports the main school facility located at 3375 W Burdickville Road, Maple City, MI 49684. The school’s primary septic system and drainfields have surpassed their useful life and have shown signs of failure in recent years. The proposed project will include the replacement of the existing sanitary sewer septic system and drainfields that treats all sanitary sewer from the Glen Lake Community School. Auxiliary school facility buildings (such as the Maintenance Garage, Bus Garage, Sports Complex, etc.) are on their own dedicated sanitary sewer system that will not be included in this project. • Complete Miss Dig prior to any underground excavation. • Contractor to coordinate with all utility companies and school to locate any underground utilities and irrigation located on site. Locations shown on drawings are approximate and it is the responsibility of the contractor to verify. • Mobilization, demolition, offsite disposal, restoration, and cleanup to be included. • Disposal of existing equipment to be removed at the direction of the Owner. • Coordination of delivery, unloading and storage of materials, coordinate all storage with Owner.