Specifications include, but are not limited to: The project is generally located in the southern and central portions of City. The project provides for the replacement for approximately 17,000 linear feet of existing 6-inch and 10-inch vitrified clay pipe (VCP) sewer line with 6-inch, 8-inch, and 10-inch fusible solid wall DR-17 or DR-11 HDPE using trenchless technology pipe bursting methods. The project also includes replacement of approximately 180 linear feet of 6-inch and 360 linear feet of 8-inch HDPE or PVC pipe by open cut methods and 850 linear feet of 6-inch sanitary sewer pipe by CIPP methods. The project includes removal and replacement of existing manholes or insertion of fiberglass manhole inserts as directed or as shown on the plan sheets, as well as replacement and reinstatement of sanitary sewer services to residential and commercial lots. Pavement repair and other incidental construction items necessary for a complete and functional project are also included.