Specifications include, but are not limited to: This work will consist of the complete demolition of the structure at the property identified as 803 CommerceStreet. Existing utilities that are part of the infrastructure in these areas that may be affected by the demolition will need to be protected and/or removed as deemed necessary by the City of Perry. Coordination with the appropriate service company, such as Georgia Power, Hargray, ESG, etc., will be the responsibility of the demolition contractor. Service outages will need to be at a minimum and scheduled in advance with at least 24-hour notice or more to all effected parties if possible. Existing electric, sewer, water, and/or gas services to the building shall be permanently disconnected and removed from the site. Any service lines that are required to be capped shall be done in a manner which is permanent.Protection of adjacent properties, streets, curbs & gutters, driveways, sidewalks, sewer and storm water inlets, water and power as well as all best management practices (BMPs) related to erosion and sediment control shall be maintained at all times. Any obstruction or temporary closure of streets, sidewalks or other City infrastructure will not be allowed unless prior approval is obtained from the City of Perry.