Construction Manager for a cost-plus project with a Guaranteed Maximum Price (GMP), for the construction of a new 33,530 square foot (approximate gross square footage (GSF) Child Development Center (the “Project”) with the following elements: Associated architectural, structural, mechanical, electrical, plumbing, etc. disciplines to provide a complete project. Early bid packages Pre-purchase of steel package and primary electrical/mechanical equipment (this project shall utilize the 4-pipe system of the existing central plant). Dewatering Possible rock excavation Full design-assist capability Building commissioning services are to be included in the Fixed General Conditions. This shall entail the commissioning of all HVAC equipment and central plant equipment, regardless of purchase point (Owner or Contractor), building management controls, and lighting controls. The attached drawings, schedule, and narratives shall constitute the basis of the GMP. Conceptual Schedule is the basis of the construction period. All proposals will be sufficiently detailed, with a delineation accurately identifying the basis of the GMP. Example for illustration purposes only: Slab on Grade recessed – 17,000 sf of 5”, 3,500 psi. Slab on Grade – 25,000 sf of 5”, 3,500 psi. Sidewalk – 2,500 sf of 3,500 psi air-entrained concrete. Wall tile at public restrooms – 775 sf, $9.50 installed allowance. FRP at wet areas – 450 sf ALL non-obvious items should be quantified and detailed to support the GMP valuation.