Specifications include, but are not limited to: Furnish all labor, material and equipment to provide for the reconstruction of existing 36” outfall line (Allenby to Kimbrough) sewer pipes using an approved Cured-In-Place Pipe (CIPP) method by forming a new pipe within an existing pipe, which has generally maintained its original shape. Bypass pumping for the 36” outfall line and two (2) 8” sewer line manhole insertions will be required. Water curing of the CIPP is required. This specification covers the general requirements for the referenced specifications, CIPP manufacturer and installer qualifications, submittal and guaranty guidelines, materials, installation and testing procedures. Each manhole within the specified segment will receive coating using OBIC polyurea at 500 ml thick.