Project includes, but is not limited to, the following construction activities: • Mobilization and provide controls as necessary to ensure public safety and facilitate construction; • Maintenance and further installation of erosion and sediment control devices; • Full Depth sawcutting of asphalt and concrete; • Remove, stockpile, and reuse of existing granite curb; • Installation of new granite curb; • Earthwork and site preparation including rough grading; • Provision and installation of concrete wheel chair ramps; • Provision and installation of detectable warning panels; • Installation of directional, regulatory, warning signs; • Pavement patching and replacement; • Line striping including cross walks and stop bars; • Loam installation and seeding of disturbed areas within the site; • Demobilize and final cleanup of the site including removal of remaining erosion and sediment control devices and any remaining sediment, pavement sweeping;