Specifications include, but are not limited to: The work at CSO Outfall 024 includes, but is not limited to, the following: 1. Installation of erosion and sediment control measures and site security features. 2. Implementation of a flow diversion/bypass pumping system. 3. Installation of orifice plate and access hatch. 4. Installation of a new manhole. Connect new manhole with existing manhole and CSO 5. System startup and training for all new equipment. 6. Cleanup, site restoration. 7. All other appurtenances and related work required to complete the project and as described and shown in the contract documents. The Work at CSO Outfall 039 includes but is not limited to the following: 1. Installation of erosion and sediment control measures and site security features. 2. Implementation of a flow diversion/bypass pumping system. 3. Installation of actuated gate and access hatch. 4. Installation of a new manhole. Connect new manhole with existing manhole and CSO 5. System startup and training for all new equipment. 6. Installation of new security fencing and gates. 7. Cleanup, site restoration. 8. All other appurtenances and related work required to complete the project and as described and shown in the contract documents. The project description is general and by no means is it a complete description of the required work. The work also includes all appurtenant work as shown and specified in the IFB and Contract Documents.