Specifications include, but are not limited to: • Removal of existing and install new rubber membrane. • Fabricate and install .032 aluminum metal on the areas required. • Remove and replace damaged insulation boards • Provide 5-year warranty on all parts, material and labor. • Pricing shall include all Applicable Tax and Freight. Replacement of Pawley Island WWTP Press Building roof shall include the following: • Obtain all necessary permits for completion of roof replacement. • Contractor shall provide necessary crane and rigging for removal and installation of roof system. • Remove the existing coping metal and drip metal on the entire roof area. • Remove the existing rubber roofing membrane on the entire roof area. • Repair the damaged or buckled insulation board where required. • Project shall include a minimum of 10(ten) insulation sheets. • Bidder shall provide a unit cost per additional insulation sheet. • Fabricate and install .032 aluminum metal on the areas required. • Install 60mil EPDM rubber roofing membrane on the entire roof area.