Specifications include, but are not limited to: The purpose of the Request For Proposals (“RFP”) is for Saline Area Schools (the “School District”) to obtain proposals from qualified contractors to provide a comprehensive installation of the Roof-Integrated Solar array for Saline Middle School (the “Work”). • CONTRACTOR is to be the comprehensive Electrical & Mechanical Contractor for the project and will be responsible for all installation and professional services necessary to complete the system as designed. This work is to include, but is not limited to, coordination with local governance, procuring non-owner furnished material, coordination with District Project Managers and District Roofer, and Construction of all aspects of the PV project unless otherwise excluded within this document. • District desires to retain Contractor, and Contractor desires to be retained, to perform or cause to be performed all work to construct and/or install the PV project and all the necessary ground/site preparations at the Site. • Contractor must be in the business of constructing and/or installing solar facilities. • Contractor must have all necessary licenses to perform work. • All work performed must be warrantied per state requirements after commissioning or at a minimum must provide a 1-year workmanship warranty in addition to maintaining manufacturer warranties. • Contractor to reference the included Design Drawings. • The Contractor shall provide all labor, supervision, and equipment to the extent not provided by District; materials, consumables, and all necessary transportation, staging, loading, unloading, and rigging to produce electrically and mechanically complete and commercially functional Solar Roof-Mount System per the referenced drawings. This is, including, but not limited to, competent supervision, shop drawings, samples, tools and scaffolding as are necessary for the proper performance of the Work • Contractor shall procure and install all items not specifically provided by District that may be necessary to produce a complete and functioning system. These items may include but are not limited to the items detailed in the “Contractor Procured Materials” section below, and will otherwise encompass all material not provided by the School District.