Specifications include, but are not limited to: • General Scope of work includes removing and replacing the existing building level network controllers at three facilities, upgrading the existing control system software and graphics, and providing building analytics. • General o Permits - Contractor is responsible for obtaining and paying for any necessary permits and inspections and installing the systems in compliance all applicable codes. A permit allowance of $5,000 should be included in the bid. o Remove and dispose of all trash and existing equipment o Provide one year warranty on parts and labor from time of final inspection. • Controls Migration / Upgrade o Migrate existing building controls system from the legacy Continuum platform to a modern platform at or above the County’s current software versions. o Graphics, scheduling, trends, and programming must all be accessible and modifiable through the graphical front end of the system on a single software platform. o Existing software and server cannot be used for HVAC controls after the upgrades are complete. o Approved Manufacturers/versions include: Schneider Ecostruxture (ASP 3.2.4.22, Workstation 3.2.3.59) Siemens Desigo (V6.0) Tridium Niagara – Honeywell (N4.10.1.36) o Reestablishing building analytics for the buildings including long term trends, error detecting, and performance monitoring. o Setup 15-minute trends for all hard points and setpoints o New graphics shall be developed for the building. Graphics developed should use Cary Regional Library as the template. o Schedule for AHU shall be set up o Alarms should be setup for Non-paged Alarms: • Pump/Fan Status • Dirty Filter Pages Alarm • Pump VFD • Fan VFD • Boiler Alarm • Chiller Alarm • Fire Alarm Active • Freezstat • AHU High Limit...