The work generally consists of the replacement of up to six (6) existing Passenger Boarding Bridges (PBBs) with new PBBs. The construction scope of work includes, but is not limited to removing the existing PBB per gate and legally disposing off site, repair of the existing pedestal on select gates and the installation of a new PBB on the specified gate, and replacing PC Air and Ground Power on all twelve bridges. Base Bid Scope of Work includes: • Installation of Temporary Construction Items • Removal of up to six Existing Passenger Boarding Bridges (PBB) (and repair of pedestal on select gates) • Installation of the proposed PBB and ancillary equipment • Final adjustments (including commissioning and acceptance) • Replacement of PC Air and Ground Power units at all twelve bridges