Specifications include, but are not limited to: This Project consists of providing all labor, material, equipment, and administrative tasks required to complete and make usable the work to furnish and install new pre-engineered underground piping for the following services: low-pressure steam & condensate return and chilled water. 1. DEMOLITION OF (2) OLD NON-FUNCTIONAL CENTRIFUGAL CHILLERS AND ASSOCIATED CHILLED WATER PUMPS, CONDENSOR WATER PUMPS, AND ALL ASSOCIATED PIPING AND CONTROLS. 2. PROVISION OF FOUR (4) NEW 100 TON CENTRIFUGAL OIL-FREE CHILLERS AND ONE 400 TON COLOLING TOWER. PROVISION OF NEW CHILLED WATER PUMPS AND ONE CONDENSER WATER PUMPS. 3. PROVISION OF NEW PIPING AS REQUIRED TO CONNECT NEW EQUIPMENT (CHILLERS, PUMPS, COOLING TOWER). 4. PROVISION OF NEW VENTILATION FANS FOR CHILLER ROOM. 5. REPLACEMENT OF ELECTRICAL COMPONENTS TO SUPPORT MECHNICAL DEMOLITION AND NEW-WORK SCOPE. 6. MISCELLANEOUS STRUCTURAL WORK TO SUPPORT MECHANICAL DEMOLITION AND NEW-WORK SCOPE. 7. CUTTING, PATCHING AND FIRESTOPPING OF FLOORS, WALLS, CEILINGS, ETC. 8. PROVIDE NEW CAMPUS-WIDE BMS AND INTEGRATE NEW AND EXISTING SELECT EQUIPMENT INTO BMS. 9. PROVIDE LIMITED WATERSIDE TESTING AND BALANCING. PRIOR TO DEMOLITION, PERFORM TEST AND RECORD READINGS AT ALL BRANCH PIPING (ON AND OFF MAIN PIPING) IN THE CHILLER PLANT BUILDING. CONTRACTOR SHALL PROVIDE THIS PRE-CONSTRUCTION TAB REPORT FOR REVIEW. 10. PROVIDE CAMPUS-WIDE CHILLED WATER AND LOW PRESSURE STEAM PIPING INFRASTRUCTURE FROM CENTRAL PLANT BUILDING TO RESPECTIVE CAMPUS BUILDING AND CONNECT TO EXISTING EQUIPMENT/END-USES.