Package 1 The Scope of Work shall include the resurfacing and sidewalk reconstruction along Sommers Road from just north of Old Highway N Route N to north of Belmonte Landing Drive, approximately 870 feet, and construction of a new alignment entrance to QT directly across from Old Highway N over Sommers Road. The scope of the project includes the milling and resurfacing, removal and replacement of concrete sidewalk, new curb ramps, truncated domes, traffic signals, utility adjustment, storm sewer and striping. Package 2 The Scope of Work shall include the reconstruction of Old Highway N between Hawk Ridge Trail and Old Forester Drive. The project includes a 3-lane roadway with cubs, enclosed drainage, sidewalks, new curb ramps, shared-use path, striping, and a new traffic signal at the intersection of Old Highway N and Hawk Ridge Trail. The project also includes widening and mill and overlay on Hawk Ridge Trial.