Specifications include, but are not limited to: 1 Building Permit is required. Furnish all labor, equipment, material and all other necessary items for construction of a multi-user ADA compliant restroom over existing 20’x21’ slab with CMU block walls and standing seam metal roof, finished gutter, anti-graffiti paint for interior and exterior (two-tone) walls of structure, ceramic tile for floor and first 4’ of walls, drinking fountain, automatic hand dryers, soap dispensers, sinks with faucet, mirrors, stainless steel partitions with doors, toilets, toilet paper dispensers, toilet ADA bars, urinal, changing stations, entrance door with heavy duty locking mechanism with frame, and all appurtenances as per city specifications. Include all labor materials, construction perimeter chainlink fence, mobilization, tools, equipment, materials, rebar installation, concrete, sanitary sewer line as necessary, water line and water meter as necessary, saw cutting, removing, disposing, and replacing of any obstruction as necessary, etc. Complete in place as per plans and specs to provide a turn-key project.; Electrical Building Permit is required. New electrical meter is required. Contractor must furnish a control box, weatherproof mechanical timer, LED lighting, wall packs, switches and outlets as necessary. Plus, all labor, equipment, material and all other item necessary to install interior and exterior lighting and all appurtenances as required by building code, complete in place as per plans and specs at; Furnish all labor, material, and all other items necessary to install a backflow preventer device and all appurtenances as required for the water service, complete in place as required by Utilities Department at: