Specifications include, but are not limited to: a. These specifications apply primarily to the approximate 8,000 square feet of entry, training room, lobby, public restrooms, restrooms on second floor, and office areas. b. This section does not apply to the remainder of the building. c. The following services shall be performed by Contractor in a good and professional manner pursuant to the below schedule. i. Vacuum all carpet and floor mats. ii. Dry mop all tile floors. iii. Wet mop tiled areas: restrooms, office space, lobby, atrium/entry, break room, and training room. iv. Empty all trash in front offices, and trash left outside of locked offices as well as, training room, restrooms, and break room, and take to dumpster, including all empty boxes marked TRASH. v. Empty all recycling bins and take to designated recycling containers, when available. vi. Clean entry door glass leading to atrium and from atrium work area. vii. Clean glass, mirrors, and other glass surfaces throughout the service area. This does not include the large panes of glass that make up the entry area atrium walls. viii. Clean and sanitize all four (4) restrooms. Do NOT re-stock toiletries. ix. Clean kitchenette, sink, and surrounding countertop, and coffee area, including wiping down all sinks, cleaning the microwaves, door handles, tables and counters in front office area, bathrooms, training room, and break room. x. Dust uncovered areas of all desks, file cabinets, bookcases, counters and other furniture. xi. Dust windowsills, including windowsills in atrium phones, and computers. xii. Remove cobwebs from corners of ceilings and baseboards. xiii. Spot clean carpet stains, upon MCEB's request. xiv. Contractor shall clean the entire building, with exception to mopping, and remove trash three (3) different times on Election Day. xv. Annual strip and wax of tiled area, preferably in the summer. xvi. Annual floor buff of tiled areas, December preferred. xvii. Annual carpet cleaning of all carpeted areas. xviii. Two times per year, in an agreed upon time and date, contractor shall sweep or dry mop tiled areas in warehouse before mopping same area.