Specifications include, but are not limited to: 1. Review the Peoria Engineering Standards Manual for relevant design information and prepare 60%, and 90% design drawings, specifications, and engineer’s opinion of probable costs for review and comment. Meet with City staff to review comments after each submittal. Prepare and distribute meeting summary notes. 2. Meet with utility companies as needed and coordinate with pothole, geotechnical, and survey data to develop design drawings package. 3. Submit design package to Maricopa County Environmental Services Department (MCESD) for an Approval to Construct permit. Conduct comment resolution meeting with County reviewers, as needed. Prepare comment response documents and revise and resubmit design documents as required. 4. Prepare final contract documents to be used for construction.