Specifications include, but are not limited to: 8 Straubel Ct. East Madison Community Center Roofing Project • GAF System Plus 40 Year- GAF Master Elite Contractor • Remove existing shingles down to deck. • Protect all outside patio furniture or decking if exists. • Re-nail any loose wood. • ** If bad or rotten wood is discovered, replace at determined cost, owner will be consulted prior to replacement. • Use 4 of 6 Layers of GAF Products detailed below to support System Plus Warranty • Install 6’ of ice and water shield at all gutter lines, rake edges, and valleys with duofast staples. • Install Synthetic underlayment to keep roof dry with cap nails per manufacturer specs. • Install GAF ProStart Starter Shingles along all gutter lines/Eves with pneumatic 1 1/4" coil nails. • Install GAF HDZ Limited Lifetime Dimensional Shingles per specifications using pneumatic 1 ¼” roofing nails. 5-6 nails per shingle. • Install GAF Seal-A-Ridge Hip & Ridge Shingles with pneumatic coil nails. • Install new GAF Cobra roll ridge vent, cut in if needed. • Install new metal pipe flashings, install new ice, and water shield around pipes. • Install new metal flashing around “approximately” 4x8 skylights, new ice, and water shield around skylights. • Install new bathroom or kitchen vent if needed. • May use commercial dumpster or dump trailer without breaking any concrete or blacktop in driveway. • Clean up all job-related debris and magnet to pick as many nails as possible. • Provide owner with GAF System Plus Warranty Info