Specifications include, but are not limited to: Purchase supports the project to establish a self-sustaining cattle operation that will help address food insecurity amongst tribal communities, as a result of Covid 19. Cattle working pen. Specifications All new construction will be pipe of 2 7/8” x .110W. Project requires an estimated total of 12,200 ft. of pipe. Pipe posts will be set every 8’. All new pipe fence will be 6’ tall. Posts must be set in ground 2’ and then cemented in place. Construct 4 each - 86’x80’ pipe pens with 10’ gate on all pens near existing barn. 8’ wide alley will run down the center of pens. Gates are to be welded on the alley side. 10’ wide alley will run in front of pens with a man gate, a cut gate leading to the pens and a loadout gate at the end of the alley way. Catch pen will be constructed out of all new pipe with an alleyway leading to the alley system. One 16’ gate will be placed in front of the catch pen. Two 16’ gates will be placed parallel in the catch pen alleyway. Catch pen alleyway will be 16’ wide at the opening and run into the alley system