Perform commissioning of six (6) petroleum product lines at Port of Alaska (POA) Petroleum Cement Terminal (PCT), including furnishing and installing six (6) emergency release couplings, fabricating and installing four (4) two-inch stripping drain lines, and a 12-inch methanol/Jet A jumper and threeinch stripping line; install Owner provided equipment including one (1) 12-inch replacement valve and five (5) basket strainers; fabricate and install a temporary eight-inch manifold to distribute fuel for flushing six (6) petroleum lines, perform flush and soak tests and a hydrotest; provide fuel testing and tank gauging services during flush and soak test. After commissioning is complete remove fuel from berthing and stripping lines using a vacuum truck, remove all materials and equipment installed to perform the test including manifold and strainers, and reconnect hose sections to PCT valves.