Specifications include, but are not limited to: The District intends to upgrade the AV equipment in the auditoriums at the high schools. The installation at the high schools is expected to occur during the summer of 2024 (refer to timeline in Section 1.2 ). The vendor shall furnish all equipment, accessories, and necessary material for a complete system as indicated on the plans and described hereinafter. The equipment specified is not all-inclusive. Miscellaneous hardware, cables, and components will be required for a complete installation. It is the sound vendor’s responsibility to provide all parts needed for a complete and functioning system. The District currently has sound systems in each auditorium that were installed in 2017 that are to be reused with the enhancements added per this specification. The intent of this RFP is to provide the school district with an integrated districtwide system. Unless specified elsewhere, goals apply to both auditoriums at North Farmington High School (NFHS) and Farmington High School (FHS). The following key features are desired: 1. Auditorium Sound and Video Display Systems at FHS and NFHS need upgrades in certain areas. The existing systems were installed circa 2017. Certain aspects of their functionality and usage are desired to be upgraded or remediated. 2. It is desired that both High School auditorium systems be as operationally similar to each other such that a user trained on one system will be able to use the other school’s system without additional training. 3. It is desired to replace and relocate the existing centrally placed video projectors. vendors are to provide new laser projectors, which will be relocated behind the existing back-of-house (BOH) control station. Two additional new projectors are to be installed in as close proximity as possible to display on newly installed electric screens to be hung diagonally outside the proscenium at stage left and stage right positions. 4. A new video distribution system utilizing Cat6A cable is to be provided, which is to accommodate all new projectors, existing backstage/green room/choir room/band room/dressing rooms, and lobby displays. New input locations are to be provided as well. 5. The existing Crestron Control System is inconsistently programmed between the two High Schools and subject to frequent failure. It is desired to replace this system to be consistent between the two buildings and free of frequent operational disruptions...