Specifications include, but are not limited to: Product and Execution 1. Workers shall be experienced and skillful in performing the work assigned to them. 2. Contractor shall verify critical dimensions, operations, and functions in the field before ordering or fabricating items which must fit adjoining construction. The Contractor shall verify all existing conditions and dimensions prior to the work. Any and all discrepancies shall be reported to the Owner and Project Manager prior to ordering any materials or performing the work. 3 The Contractor shall follow manufacturer’s instructions for assembly, installation, and product adjustment. In the event of conflicting specifications, the specifications of the manufacturer shall prevail. 4. The Contractor shall notify the Owner and Project Manager, within 24 hours of discovery, in the event unforeseen circumstances. If the work is deemed additional or extra by the Project Manager then a change order will be negotiated, executed, and authorized by the Contractor, Owner and Project Manager prior to the commencement of the work. Any work performed prior to the execution of a change order may not be considered for payment. 5. The specifications do not attempt to detail every task and procedure required to perform the work in full. The Contractor shall perform the work as required to complete the work in a professional manner using customary trade practices and standard work practices. Removal of Debris and Site Maintenance 1 The contractor shall include in their bid the cost of removal of job-related debris and lawful disposal of said debris. 2. The Contractor shall coordinate with the Owner for the placement of trash containers, if necessary, prior to the start of demolition. 3. The Contractor shall be responsible for the daily clean up and maintenance of the site. 4. The Owner shall not place anything in the dumpster without prior approval from the Contractor. Material Delivery, Storage and Handling 1. The Contractor shall determine and comply with manufacturer’s recommendation on product handling, storage installation and protection. 2. Products shall be delivered to the job site in their manufacturers’ original containers, with labels intact and legible. Do not deliver materials to job site until they can be properly protected. 3. Maintain packaged materials with seals unbroken and labels intact until time of use. 4. The Owner and or Project Manager may reject materials and products which do not bear identification satisfactory to the Owner or Project Manager.