Specifications include, but are not limited to: Commercial Splash pad company shall design, build and install all equipment for a splash pad for Knox County Parks and Recreation (Owner). Products must comply with ADA (Americans with Disability Act). 4.1.2 This includes all equipment, labor, materials, etc. as specified herein. Freight for all parts and equipment is included in the price. 4.1.3 Splash pad area will be roughly 2500 square feet with a total area of 4135.59 square feet. 4.1.4 Contractor is responsible for assembly and installation of all equipment included herein in required location as shown on plans. 4.1.5 Contractor is to provide a competent, experienced foreman for management of above stated project. Foreman’s resume should be included in submission. 4.1.6 Contractor shall erect the equipment at the site in full compliance with current rules and regulations of state, county and local regulations. If, because of certain job conditions, any work specified to be performed under this contract must be done by other, the Contractor shall sub-let such work to those who are qualified to do such work or make other arrangements at his own expense as approved by the Owner. Owner to be notified of changes of subcontractors and to be given qualifications of said subcontractors. 4.1.7 The respondent is requested to visit the site for a site visit before submitting a response to this RFP. It is the contractor’s responsibility to make sure all equipment and features are optimal for the location and correct equipment is supplied. 4.1.8 Contractor is responsible for redesign and construction upgrades of pump house and splash pad. Pump house and splash pad shall be redesigned to house and accommodate all new features, pumps, piping, equipment, filters, air vents and exhaust fans, etc. 4.1.9 Contractor is responsible for final sewer connection for drain line, pump house drain connection and piping to sanitary sewer line. Contractor responsible for new concrete floor of pump house and surface of splash pad. 4.1.10 Contractor will clean up all debris made by his/her workmen immediately upon completion of installation and remove same from premises. Equipment and materials are to be received at the site in clean condition and damage-free condition prior to Owner's acceptance so as everything to be in optimal working condition. 4.1.11 All of the Knox County procurement procedures apply to any and all equipment purchases by the owner. 4.1.12 The budget for this project is not to exceed $450,000 4.1.13 This project to be completed in full detail to include all plumbing, electrical, excavation, and construction from notice to proceed to final inspection. All work to be completed by Licensed contractors.