Specifications include, but are not limited to: Req. approx. 1,300 ft2 temp sign; 9 ea PCMS; 1,250 hr flag; 5 ea flag sta light; 344 hr pilot car; 2 ea AFAD; 88 ft temp rumb strip; const surv work; 260 yd3 gen exc; 670 yd2 subg geotext; br rem work; 1,050 yd2 micro-mill; 780 yd2 hydrodemo; 270 yd2 special repr zone; 930 yd2 sawcut texture; 319 ft elasto conc nose; 6 ea br id marker; 74 yd3 HESC overlay; 145 ft exp joint; 128,220 yd2 CPPR; 2,650 ton aggr shoulder; 40 ton tack coat; 19,750 ton ACP (1,190 ton PG64-28); 1 ea core corr; 1,150 yd2 ACP repair; 23 ea asph appr; 813 ft gd rl; 7 mi rumb strip; 134,572 ft pvmt marking high perform. Completion Time: September 30, 2024. Classes of Work: A) Asphalt Concrete Paving and Oiling, or B) the combination of 1) Bridges and Structures & 2) Miscellaneous Highway Appurtenances.