Specifications include, but are not limited to: The work includes the reconstruction of: Lake Street and Dewey Court Street, including replacing the Lake Street Boat Landing with a small park. Road work will include spot repair of curb and gutter, base removal and replacement, upgrading sidewalk ramps, installation of new sidewalk, installation of new watermain, replacement of sanitary sewer, and installation of new storm sewer, storm sewer manholes, and storm sewer inlets. The roadway profiles, alignments and geometry will mostly remain the same except at the east end of Lake Street where the roadway width will be reduced to allow for sidewalk installation. The City is flexible on scheduling this work, intended to be pursued sometime between May and October, with completion within 90 calendar days of starting.