Specifications include, but are not limited to: This project consists of doing patch work within the Herons Ridge Subdivision. Along will add alternate work of patching on Canada Road South of the I-40 interchange bridge. Location of patching are depicted in maps under the Appendix sections. Temporary traffic control measures shall be used during all phases of construction. All attempts shall be made to keep at least one lane of the roadway open. In the event of a road closure, the Owner shall be notified within 48 hours of the impending work. A traffic control plan for each location shall be submitted to the City Engineer for approval prior to construction. The contractor is responsible for all utility locates in the area of work and for those that may be affected by the construction. Coordination with the utility company may be required. All construction material shall be removed and properly disposed of in accordance with State and local regulations within the time limits of the project. Removal and hauling away of all construction debris including unsuitable soils shall be the responsibility of the Contractor. Material/Density testing will be performed at the request of the Owner. Testing will be paid by invoice.