Specifications include, but are not limited to: 1. Remove existing Poured-In-Place Rubberized Safety Surfacing (Tot Turf) installed over a compacted aggregate (ABC) sub-base with a concrete border, and/or a turndown in a sand playground. 2. Dispose of all waste materials off-site in a manner that conforms to all federal, state, county, and local codes. 3. Repair any disturbance to the aggregate sub-base, bring sub-base back into level, and compact sub-base to 95%. 4. Repair any damage to existing facilities and play equipment caused by the Contractor’s activity at Contractor’s expense and to the satisfaction of the City. 5. Repair any damage to the existing turf caused by Contractor (ruts filled with clean soil, compacted and sod added to match adjacent grades).