Specifications include, but are not limited to: The Project will consist of four major Project component elements: • Demolition • Dredging • Berth 4 Construction • Berth 1 Strengthening Demolition Demolition for the proposed project will include the demolition of approximately 16,675 square feet of Berth 1 current berthing structures in conflict with the new construction. This work will consist of demolition of a portion of the existing berth 1, edge beam, and light pedestals. Demolition limits on the western end of the berth will end at the first bent cap where the Berth 1 access trestle starts with a pavement sawcut. Demolition limits on the eastern end will extend to the edge of Berth 1 for the installation of a dock connector bridge to Berth 4. Dredging Dredging for the proposed Project consists of hydraulic dredging of the proposed berth to a depth matching the South Brunswick River depth of -36.0 feet mean low water (MLW) with an allowance for advance maintenance and overdredge of 4.0 feet (-40.0’ MLW). The volume of hydraulic dredging is 285,000 cubic yards (CY). Hydraulic dredge material will be placed within the Andrew’s Island Confined Disposal Facility.