Specifications include, but are not limited to: The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve roadways by removing/replacing and/or repairing concrete panels and concrete rollover/barrier curbs as required in specifications for the following locations: - Seymour Meyers Dr (R01J038) Section 10 Township 7S Range 10E Covington; - Hickory Dr (R04C014) Section 54 Township 7S Range 11E Madisonville; - Magnolia Ln (R04A036) Section 21 Township 7S Range 11E Covington; - Woodvine Ct (R04A037) Section 22 Township 7S Range 11E Covington; - Debellevue Pl (R04D115) Section 40 Township 7S Range 11E Mandeville; - Live Oak Lp (R04D079) Section 40 Township 8S Range 11E Mandeville; - Mayhaw Branch Dr (R04D128) Section 40 Township 8S Range 11E Mandeville; 1. Contractor shall field verify all quantities and measurements. 2. Contractor shall be responsible for locating and protecting all existing utilities. 3. Two-way traffic shall be maintained at all times during construction. Contractor shall have flagmen on both ends of work zone. If Police details are used for traffic control this does not take the place of flag men. There may be areas of high volume traffic and special barricades may have to be used. 4. Construction work shall not begin until signs, barricades, project signs and other traffic devices have been erected and approved. Contractor shall maintain project and construction signs. 5. All existing sewer lines shall be tied-in at no direct pay. 6. Asphalt and concrete driveway tie-ins shall be tied in to existing surface material. 7. Any additional work performed by the contractor without prior written approval from St Tammany Parish Department of Engineering, the cost of the work will be borne by the contractor and will not be reimbursed by the Parish. 8. Contractor shall ensure roadway and shoulders drain accordingly without any surface ponding/”bird baths” after rain events. 9. Materials Testing: All required testing and reporting shall be the contractor’s responsibility at no direct pay. Sampling and Testing will be performed in accordance with the St. Tammany Parish Roadway Testing and Inspection Standards for Residential Subdivisions (Attached with Bid Proposal) and LADOTD Standard Specifications for Roads and Bridges, Latest Edition, Section 101 and 106. 10. Roads and surrounding areas shall be dressed after 7 calendar days and no later than 10 calendar days after opening of street. Late Fee of $1.00 per Linear Foot per Calendar Day shall be charged if not completed with the specified time frame.