Specifications include, but are not limited to: A. Contractor shall remove approximately 93 hazardous trees, marked for removal by park staff, around the CCC Cabins. B. Contractor shall grind all trees and limbs that can be ground. C. Contractor shall dump all tree grindings at designated area in park. D. Contractor shall remove all trees that are marked for removal and can’t be ground to a location off park property in accordance with all applicable laws and regulations. E. Contractor shall cut the trees as close to the ground as possible. F. Contractor shall grind all the stumps from removed trees, tree roots, and existing stumps a minimum of 4-inches below existing ground level. Contractor shall remove all stump grindings and dump at designated area on the park. G. Contractor shall remove any limbs that are damaged in the surrounded trees, from the trees being removed. H. Contractor shall remove all debris left by removing trees from all areas around cabins for the addition of topsoil and from any sidewalks, cabin roofs, cabin driveways and cabin area roads. I. Contractor shall complete the work located around each cabin while the respective cabin is closed for repairs.