Specifications include, but are not limited to: Remove all existing insulation around metal piping in the crawlspace of each building. Follow all requirements/laws surrounding the abatement of asbestos... The contractor shall provide all materials, tools, machinery, labor, and supervision necessary for the plumbing insulation asbestos abatement. The contractor shall be responsible for obtaining the local asbestos abatement and demolition permits. The contractor is responsible for obtaining any written asbestos project design, as needed, from a South Carolina Department of Health & Environmental Control (SCDHEC)-licensed asbestos project designer prior to commencement of asbestos abatement activities. The contractor shall be responsible for the removal and proper disposal of all materials. Debris to be delivered to approved landfill(s) licensed for any type of debris (i.e., asbestos waste and C&D debris) in accordance with all Federal, State, and local laws and regulations. All loads shall be covered and secured prior to and during transport.