Specifications include, but are not limited to: 1) Unit Price No. 1 – Repair/Replace Cementitious Wood Fiber Deck: Includes material and labor to replace existing cementitious wood fiber deck per section 03 51 10 as deemed necessary by the Owner/Architect. Based on this Unit Price, include a quantity of 200 Square Feet of Cementitious Wood Fiber Deck Repair/Replacement within the BASE BID cost as an allowance. 2) Unit Price No. 2 – Repair/Replace Gypsum Concrete Roof Deck: Includes material and labor to replace existing gypsum concrete roof deck per section 03 51 00 as deemed necessary by the Owner/Architect. Based on this Unit Price, include a quantity of 2000 Square Feet of Gypsum Concrete Roof Deck Repair/Replacement within the BASE BID cost as an allowance. 3) Unit Price No. 3 – Replace/Repair Metal Deck: Includes material and labor to patch and repair or replace existing metal deck per section 05 31 00 as deemed necessary by the Owner/Architect. Based on this Unit Price, include a quantity of 100 Square Feet of Metal Roof Deck Repair/Replacement within the BASE BID cost as an allowance. 4) Unit Price No. 4 – Blocking: Includes material and labor and all other costs for 2X8 blocking due to deterioration or damage or additional blocking that would be required that is not specifically called for on the Drawings and Specifications. Based on this Unit Price, include a quantity of 2000 Linear Feet of Blocking within the BASE BID cost as an allowance. 5) Unit Price No. 5 – Additional Roof/Overflow Drain (No Allowance): Includes material and labor and all other costs for roof drain with strainer installation and connection to the existing storm drain system at nearest accessible location. 6) Unit Price No. 6 – Repointing Masonry: Includes material and labor and all other costs to repoint masonry in wall areas above the roof line that is not specifically called for in the specifications. Based on this Unit Price, include a quantity of 4000 Square Feet of Masonry Repointing within the BASE BID cost as an allowance.