Specifications include, but are not limited to: The work shall consist of the removal and restoration of damaged sidewalks and stone curbing throughout City of New London as requested by the Director of Public Works. Site Preparation/Site Removals - Work under this section shall include, but not limited to the following: 1. Setting soil erosion controls around sloped areas and near access road and providing barriers in the construction site to prevent public access. 2. Removal of damaged sidewalk panels and curbing as requested. 3. Prep area for new sidewalk panels. 4. Dispose of waste materials. Contact “Call Before You Dig” (800-922-4455) prior to commencing demolition. The Contractor shall furnish signs, lights, barricades and other equipment as necessary for the safe operation of their work. All construction staging shall be removed upon completion of the project. The Contractor shall be responsible for and damages to structures and facilities that are to remain. The Contractor shall repair any damages to the satisfaction of the City of New London at no additional cost. The Contractor shall clean up and remove debris resulting from demolitions as the work progresses. Debris shall become the property of the Contractor who is responsible for proper disposal. No demolition material shall be left on the site after the completion of the project. Granular Fill - “Granular Fill” includes the furnishing and installation of material to be used as a foundation for structures, to replace unstable material in slopes and shoulders, to replace rock and unsuitable material in trenches, and elsewhere as indicated on the Plans or Specifications or where directed by the Engineer. It shall consist of gravel conforming to the requirements of these specifications...