Specifications include, but are not limited to:. The TFS will be designed to remove trace amounts of copper from the plant effluent before discharging into Hannah Creek. The TFS will treat an average daily flow of 0.5 million gallons per day (MGD) with the ability to treat 1.5 MGD peak flows during wet weather events. Implementation of the TFS project will occur in three steps. The first step consists of selecting a TFS to be incorporated into the plant design. The second step consists of design and preparation of Contract documents, including an allowance for the selected TFS, by Peoples & Quigley, Inc (Engineer). The third step consists of bidding and awarding the project to a general contractor (Contractor), followed by construction and start-up.