Specifications include, but are not limited to: 1. Traffic Control: The Contractor shall be responsible for all traffic control activities required during the performance of the Work. The Contractor shall submit a work sequence schedule to the City for review and approval no less than two weeks prior to beginning construction. Notification signage to be placed on each approach to the job site. Contractor shall provide all necessary traffic control devices, signage, and barricades as required by MUTCD standards. No full closure of Lagrange Street will be permitted without prior approval. All cost associated with traffic control shall be included in Fee Proposal . 2. The Contractor shall coordinate with local utility agencies to ensure protection of all utilities in the project area. 3. The Contractor shall maintain clean and safe work zones at all times. 4. All pavement and subgrade repairs will consist of the following items: A. Setting up Safe Work Zones B. Saw cutting area for repair C. Excavating area to a depth of 10 inches D. Compacting bottom of excavated area E. Pouring 8 inches of 3000PSI concrete F. Placing “Street Plates” over concrete to allow vehicle movement while curing G. Placing and compacting 2 inches of 9.5MM asphalt on concrete 5. Contractor shall keep a quarter inch tolerance from existing driving surface and new asphalt placement to ensure a smooth driving transition. 6. Contractor shall thoroughly clean work zone to be free of any dirt and debris and dispose of all waste materials off-site at a facility permitted to accept such materials. 7. All Manhole adjustments shall be made with brick-and-mortar technique with a quarter inch tolerance. Ring and cover shall have a 3 foot by 3 foot concrete collar around the circumference of the ring that is at minimum 8 inches deep poured with 5000PSI concrete. 8. All water valvesshall be adjusted to a quarter inch tolerance and poured with 5000PSI concrete collar 1 foot by 1 foot.