All work shall conform to the following City of Tonganoxie Standard Technical Specifications. Asphalt Milling - Street milling is approximately 11,774 sq yd. Edge milling shall be 1.75 inches in depth along curb to 0 inches at 7 ft. As needed for headers joining existing asphalt or concrete driveways and streets - include in bid. Asphalt Overlay - Approximately 27,438 sq. yd. with a minimum 2-inch overlay. Overlay shall maintain a minimum ¼ - ½ inch per foot fall to the curb line. All drainage across intersections shall be maintained or improved. Curb Replacement- 4,852 ln ft. - Curb detail and highlighted maps are attached. Curb replacement will be completed prior to mill and overlay. 1) SS1H tack oil will be used according to manufacturer specifications. Place tack coat just enough in advance of paving operations to allow the tack to cure before asphalt is placed. No traffic shall be allowed on tacked surfaces. 2) Asphalt shall be SR-12.5 A with a maximum 25% recycle. The use of recycled roofing materials will not be allowed. 3) The mix shall be transported to the jobsite in vehicles cleaned of all foreign material. The contractor shall provide a sufficient number of haul vehicles to ensure an orderly and continuous paving operation. All asphalt shall be delivered to the paver at a temperature between 250 degrees F and 325 degrees F. 4) In laying the mix adjacent to any finished area, it shall be placed sufficiently high so that, when compacted, the finished surface will be true and uniform and match existing surface. 5) Compacting equipment shall conform to the requirements of the KDOT standards. Compaction shall begin as soon as the temperature and mix conditions permit without shoving or tearing, the asphalt shall be thoroughly and uniformly compacted. The final rolling shall be accomplished with a steel roller.