Specifications include, but are not limited to: Actual resurfacing will begin at the intersection with Pleasant Valley Road and continue south where the road ends. The nearest address to the starting point is 852 Terhune Road, SE. There is a gravel turn around area that is not part of this project. Asphalt mix can be Smart Mix (details in the attached technical brief), or a similar mix with a minimum dosage of 0.6% by weight of the mix. • Floyd County will mark the actual project limits. • Floyd County will be responsible for all prep work, including all necessary patching and leveling. • The Contractor is to provide all materials, as specified in the Scope, and labor/equipment required to complete the resurfacing project. • The lump sum bid price for ‘Traffic Control’ shall include all other costs that are incidental to placement of the mix, including mobilization and required plant modifications. • An additional price line is to be provided and completed by the Contractor which indicates a price per ton for the 9.5 MM SP TP 2 (F-Mix) incl. SmartMIX additive. • The approximate tonnage estimated for the project is approximately 600 tons.