EASTSIDE OFTHEFRONTOFTHE BUILDING STARTING ATTHE 3RD DOWN SPOUT TO THE WEST, DIG A TRENCH APPROXIMATELY 47 FEET 6 INCHES EAST AND CONNECT THE REMAINING TWO DOWN SPOUTS. DIG UNDER SIDEWALK THEN BLADE GRAVELBACK ANDTRENCH APPROXIMATELY 118FEETTOTHE NORTH DITCH. WESTSIDE OFTHE FRONTOFTHE BUILDING STARTING ATTHE EAST DOWN SPOUT,THENTRENCH 42FEET 6INCHESTOTHESIDEWALK ANDCONNECT THE TWOOTHER DOWNSPOUTS. CONNECTTHEELECTRICAL CONDUITINTO THE DITCH WITH DRAINPIPE. BLADE ROCK OFF AND DIG UNDER THE SIDEWALK. TRENCH 116 FEET NORTH TO THE DITCH BRINGING THE ELECTRICAL CONDUIT ABOVE THE GROUND. THE GRANT COUNTY FAIR BOARD WILL PROVIDE THE FOLLOWING: 6 INCH PIPE. BIDDER WILL PROVIDE THE FOLLOWING: 90° FITTINGS, TEES, COUPLER, ELECTRICAL CONDUIT AND FITTINGS. EACH SIDE IS TO HAVE 6 INCH COVER OVER PIPE. GRANTCOUNTYFAIRBOARDWILLCONTACTOKIEDIGTOLOCATEALLBURIED LINES. AT DITCH CUTPIPE AT45°AND CONCRETE 18INCHES BY 18INCHES. SQUARE 4 INCHES THICK AND FLUSH WITH GROUND. ONE SIX INCH WATER MAIN KNOW TO BE IN DITCH.