Specifications include, but are not limited to: 3.01 PREPARATION A. Maintain benchmarks, monuments and other reference points. Reestablish if disturbed or destroyed at no cost to Owner. 3.02 CLEARING AND GRUBBING A. Clear and grub areas required for access to site and execution of the work. Remove all stumps, roots within limits of grubbing. B. Grub borrow pit, waste area and stockpile areas of all objectionable material. Strip overburden before placing material in stockpile areas 3.03 DEBRIS REMOVAL A. Do not bury materials on site, unless approved by owner. B. Do not burn material on site unless first given approval by Maury County and the owner. 3.04 REPAIRS A. Should existing utilities or other physical property be damaged by work of this Section, repair damage to preconstruction condition or better. B. Backfill all excavations opened as a result of the work of this Section with the type of fill specified in Section 31 24 00 for the individual locations.