The Contractor shall fully renovate a total of 18 greenside bunker cavities in this project with 2 bunkers (#2 bunker and #16 bunker) being reduced in size by at least 1/3 existing size. Contractor shall be responsible for removing existing sand, inspecting drainage tiles, and repairing any damage, installing selected bunker liner, testing installed bunker liner to ensure it conforms to company requirements, installing new sand, packing sand, and opening for play. Approximately 29.388 square feet of new bunkers shall be installed on this project and approximately 2,060 square feet of bunkers eliminated, shaped, and sodded. Sand Selection—Contractor shall select a tested sand from a local source that meets all United States Golf Association and patent company specifications for acceptable sand. Chosen sand shall be able to meet the specifications of a maximum slope of bunker less than eighty percent (80%) of the angle of repose. The Contractor shall present a sample of the bunker sand with testing results prior to installation and may be required to submit additional samples throughout the project. Pre-Approved sand providers are Golf Agronomics G Angle, Bulk Aggregates, Turf Materials (Premium White Sand of Arkansas), and Short Mountain Silica. Better Billy Bunkers and Capillary Concrete are pre-approved brands.