Specifications include, but are not limited to: The majority work of this contract is generally described as follows: 15,000 SF remove concrete sidewalk and approaches; 100 SF concrete apron removal; 50 LF remove curb and gutter; 100 SF remove integral sidewalk/curb; 50 CY excessive cut; 50 CY excessive fill , gravel; 15,500 SF, 4-inch concrete sidewalk; 250 SF, 6-inch concrete sidewalk; 50 LF, 30-inch curb and gutter; 100 SF, 7 -inch concrete aprons; 50 LF, 6-inch concrete curb; 200 SF, integral sidewalk and curb; 100 LF concrete sawing; 500 SF grading for new sidewalk; 60 SY 4-inch topsoil, seed, fertilizer; 100 SF, 6-inch concrete sidewalk with panel finish; 10 EA, curb ramp detectable warning fields. Root grinding and removal shall be incidental to the contract