Specifications include, but are not limited to: This project consists of, but is not limited to; Labor and Materials for the removal, disposal, and replacement of the existing main roofing system with preformed 26 Gauge metal Snap Lock Panels, Dry In the roof with proper underlayment such as ice and water shield at all gutter lines, valleys (metal roofs will have high temp ice and water) and Installing synthetic underlayment everywhere else to keep the roof dry, flashing required to weatherproof the system (ridge, hip, valley, cleat, eave, rake wall, rake edge, apron, inside corner, outside corner, gutter, downspout, drip sill, end wall, and other miscellaneous flashing), related accessories necessary for attachment of the roofing system, all butyl tape and sealant used in conjunction with the roofing system, and necessary attachment hardware as required to meet the performance standards and complete the roofing enclosure as indicated by Contract Documents.